The Lyme Morgellons protocol, should I run all 4 of my generators on this for more power / effectiveness? What Amplitude should I set? I have had the terrain protocol running for 11 days now, do I need to stop and proceed to the next step?

Typically, after the Terrain completes the first cycle, and we want to run the M&L Protocol, we stop the Terrain, Load the All Maintenance Preset and run that constantly during the ENTIRE M&L Protocol.

All of the other generators we want to use would be set up as described in either Method A or Method B for Remote Mode.

Method A, where multiple generators run the same Preset on a 5 minute delay between starts, will take longer but be more thorough - according to the author.

Method B, where Presets each run on one generator for the time specified, is faster through the Presets, but may compromise thoroughness.

The Amplitudes, etc., are all set when using the Presets. The only thing to do is to include the "Your Scan" programs, or delete this and run when running on more than one person at a time.

For more details, please check the link:
https://www.facebook.com/groups/spooky2/permalink/808688412626397/

Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.

Articles in this section

See more
Our Blog
Get the latest news and updates first
Our helpline hours:
9 AM – 6PM UTC+8, Monday – Friday
Video Guides
Learn how to use Spooky2 with our short, step-by-step video guides