It is said that we can not run the same frequency on different generators at the same time. At the R03 preset of morgellons protocol, the first frequency duration is 1800s, 30 mins. At the 6th mins, 2 generators will run the same frequency, is this safe?

The problem with starting two generators running the same frequencies at the same time is that it's possible (but highly unlikely) that one may be 180 degrees out of phase with the other. If this happens, both signals cancel each other out. However, the separation must be exactly 180 degrees, and the chances of that are very small.

Delaying the start of each one for five minutes makes cancellation even more unlikely.